Search

Search

Help

Page 5 of 5. Showing 45 results (0.013 seconds)

  1. How to use the mental ray Distributed Bucket Render (DBR) or V-Ray Distributed Render (DR) feature with Qube!

    -Ray are designated, the job will render the only using the master node-- other reserved nodes will sit idle until the job is finished or killed. Due to the inherent dependency…
    Qube 6.4May 23, 2013
  2. Startup and Configuration options

    is started by a Qube! administrator. If those two requirements are met, then for jobs owned by the logged in user (when viewing the queue on a device), "Kill" and "Retry Failed" buttons…
    Qube 6.4Apr 29, 2013
  3. Parameters

    for the studio. Retry Frame/Work: Number of times to retry a failed frame/work. Value of -1 means use the default for the studio. Subjob Timeout: Kill the subjob process if running…
    Qube 6.4Mar 11, 2013
  4. Filtering

    ). Frame/Process Status Tally Fields There are individual columns that provide a running tally per job for pending, complete, running, blocked, killed, and failed frames or subjob…
    Qube 6.4Oct 15, 2012
  5. Diagram of Tabs and Panes

    Layout Pane *** GREY = KILLED JOBS*** The most significant portion of the job control and monitoring workflow. Jobs that are displayed here can be filtered, sorted and selected…
    Qube 6.4Oct 12, 2012